A clear title level land located 90km away from karad nh4 on the pandarpur state highway. Ideal for solar power plant ,Already tata solar power operational in close vicinity. The location is best suited for the purpose with ideal radiation index of 6.7. The land can be extended as per requirement of the project. 33kva sub station located at about 6...